pre-bid meeting for Design, Supply, Installation, Testing and Commissioning Extension Transformer Bay of the existing 150/20kV Liquiça Substation to supply power to Tibar Bay Port
pre-bid meeting for Design, Supply, Installation, Testing and Commissioning Extension Transformer Bay of the existing 150/20kV Liquiça Substation to supply power to Tibar Bay Port
Comentarios (0)